Team Dynamics
My team members Faye, Jamie, Cameron and I worked extremely well together on getting our project completed in a timely manner and efficient way. We all had a lot of different contradictory ideas at the beginning on where we wanted to place it and how we wanted it to look, which became a problem on getting the project going. However we realized that if we wanted to get it done and have an exceptional piece to display to our fellow classmates, then we would have to take different aspects of each team members ideas and piece them together to make a whole. Some of us wanted to just do solid white and black to display contrast with paint on our letters, and some of us wanted to actually cut out parts of the word and let the black or white show through the back of the letter, but we decided to settle on the better design which was the cut out. Once we got passed the construction disagreements and agreed on our design it was all downhill from there and we worked long and hard to make our project aesthetically pleasing. The only other issue we had was trying to find times when we could all meet, and some of our group members not showing up to a scheduled construction time, but we managed to still get it all done by dividing and conquering and also a few times we were all together late at the design studio. It was somewhat difficult to find times where we actually had space to work in the design studio because this project needed a lot of space and work area, but the solution to that problem was to come later when most the students we gone. All in all I think our group was very collaborative and had many great ideas, which showed in our final product.
No comments:
Post a Comment